Enhancing Productivity in Construction Trades in Labour-Intensive Construction Projects

Authors

DOI:

https://doi.org/10.26437/ajar.v11i2.1041

Keywords:

Construction. labour-intesive. management. productivity. worker

Abstract

Purpose: The study sought to investigate the factors impacting productivity in labour-intensive construction projects, focusing on bricklaying and concreting in Zambia.

Design/Methodology/Approach: This study adopted structured interviews and a questionnaire to collect data for the dependent and independent variables. The independent variables were project-related, management-related, labour-related and industry-related factors, while labour productivity was the dependent variable. 150 sets of questionnaire were administered to stakeholders in the construction industry, and a response rate of 81% was obtained. The primary data was evaluated for validity and reliability and analysed using Statistical Package for Social Sciences software. The analysis revealed a positive and significant relationship between the factors of the independent variables and the dependent variable.

Findings: The data analysis revealed a positive and significant relationship between factors of the independent variables and the dependent variable. Among the research findings were the 36 key factors affecting productivity identified from the literature review and grouped as project-related, management-related, labour-related and industry-related. The extent of the impact of each factor on construction labour productivity was also established using descriptive statistics. The management and project-related factors were found to have the highest impact on workers’ productivity.

Research Limitation: The study was limited to bricklaying and concreting trades. Other trades must be examined to check if the results are similar.

Practical Implication: Manpower planning and human resource management help improve the workforce's efficiency, thereby substantially increasing the number of youth and adults with relevant technical and vocational skills.

Social Implication: Labour productivity helps create meaningful employment, decent jobs, and entrepreneurship opportunities.

Originality/Value: The study sought to identify the factors impacting productivity in labour-intensive construction projects, explore the most critical variables and develop a model to improve construction output and build capacity.

Author Biographies

  • S. Ngoma, University of Zambia

    Dr. Sydney Ngoma is a Researcher at the Department of Civil and Environmental Engineering, School of Engineering, University of Zambia.

  • C. Kaliba, University of Zambia

    Dr. Chabota Kaliba is a Senior Lecturer at the Department of Civil and Environmental Engineering, School of Engineering, University of Zambia.

  • E. M. Mwanaumo, University of Zambia

    Prof. Erastus Mwanaumo is an Associate Professor at the Department of Civil and Environmental Engineering, School of Engineering, University of Zambia.

References

Abdelaal, M., Emam, H. & Farrell, P., (2015). Improving workflow in construction projects in

GCC. The 2nd International Conference on Buildings, Construction and Environmental Engineering (BCEE2), Lebanon.

Abdel-Hamid, M. & Mohamed Abdelhaleem, H., (2022). Impact of poor labor productivity on

Construction project cost. International Journal of Construction Management, 22(12), 2356-2363.

Ahmed, S.M., Azhar, S., Castillo, M. & Kappagantula, P., (2002). Construction delays in

Florida: An empirical study. Final report. Department of Community Affairs, Florida, US.

Alaloul, W. S., Musarat, M. A., Rabbani, M. B. A., Iqbal, Q., Maqsoom, A. & Farooq, W.,

(2021). Construction Sector Contribution to Economic Stability: Malaysian GDP Distribution. Sustainability, 13(9), p.5012.

Alinaitwe, H. M., Mwakali, J. A. & Hansson, B., (2007). Factors affecting the productivity of

Building craftsmen‐studies of Uganda. Journal of Civil Engineering and Management, 13(3), pp.169-176.

Allmon, E., Haas, C. T., Borcherding, J. D. & Goodrum, P.M., (2000). US Construction Labor

Productivity Trends, 1970–1998. Journal of construction engineering and management, 126(2), 97-104.

Almamlook, R., Bzizi, M., Al-Kbisbeh, M., Ali, T., & Almajiri, E., (2020). Factors affecting

labour productivity in the construction industry. American Journal of Environmental Science and Engineering, 4(2), 24-30.

Alyew, A., Bassa, M., Reta, A. & Tora, M., (2020). A Study on Factors Affecting Labour

Productivity on Construction Projects in Wolaita Zone, Ethiopia. Int. J. Eng. Res, 8(12), pp.817-822.

Assaad, R.H., El-Adaway, I.H., Hastak, M. & LaScola Needy, K., (2023). Key factors affecting

labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1), p.04022158.

Attar, A.A., Gupta, A.K. & Desai, D.B., (2012). A study of various factors affecting labour

productivity and methods to improve it. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 1(3), pp.11–14.

Austin, P. C., & Steyerberg, E. W., (2015). The number of subjects per variable required in

linear regression analyses. Journal of Clinical Epidemiology, 68(6), 627-636.

Baldwin, L.M., Klabunde, C.N., Green, P., Barlow, W. & Wright, G., (2006). In search of the

perfect comorbidity measure for use with administrative claims data: does it exist? Medical care, 44(8), 745–753.

Bamfo-Agyei, E., Aigbavboa, C., & Thwala, W. D. (2022). Measuring productivity of labour-

intensive work practices in road construction in Africa. Routledge.

Bamfo-Agyei, E., Aigbavboa, C., & Thwala, W. D. (2019). Measuring labour productivity in

labour-intensive works on road construction in Ghana. In Advances in Human Factors, Sustainable Urban Planning and Infrastructure: Proceedings of the AHFE 2018 International Conference on Human Factors, Sustainable Urban Planning and Infrastructure, July 21-25, 2018, Loews Sapphire Falls Resort at Universal Studios, Orlando, Florida, USA 9 (pp. 515-523). Springer International Publishing.

Bamfo-Agyei, E., Thwala, D. W., & Aigbavboa, C. (2023). Optimisation of labourintensive

productivity for construction projects in Ghana. Acta Structilia, 30(1), 122-154.

Bamfo-Agyei, E., Thwala, D. W., & Aigbavboa, C. O. (2020). Influence of workforce on

productivity of labour-intensive works on feeder road construction in Ghana. African Journal of Applied Research, 6(1), 91-104.

Becker, G. S. (1964). Human Capital New York. Columbia University for the National Bureau

of Economic Research.

Bodapati, S.N., (2003). Perspective on construction in the USA. Construction Information

Quarterly, Volume 5 Number 4, pp 3-7, The Chartered Institute of Building.

Borg, L., & Högberg, L., (2014). Organization of laundry facility types and energy use in

owner-occupied multi-family buildings in Sweden. Sustainability, 6(6), 3843-3860.

Cheelo C. & Liebenthal R., (2020). The Construction Sector in Zambia In Mining for Change:

Natural Resources and Industry in Africa. J. Page and F. Tarp (Ed), Oxford University Press.

Chen J.J., (1998). The Characteristics and current status of China’s construction industry,

Construction Management and Economics, 16, pp 711-719

Cheung, S. O., Wong, P. S. P., Fung, A. S. and Coffey, W. V., (2006). Predicting project

performance through neural networks. International Journal of Project Management, 24(3), pp.207-215.

Chi, P., (2019). Working environment and labor efficiency of state owned enterprises and

foreign corporations in Vietnam. Retrived on, 1, p.2022.

Chia, R., (2002). The Production of Management Knowledge: Strategies for Reducing Cost

and Improving Service, Pitman Publishing, London.

Chia, W. K., Teo, M., Wang, W. W., Lee, B., Ang, S.F., Tai, W. M., Chee, C. L., Ng, J., Kan,

R., Lim, W. T. & Tan, S. H., (2014). Adoptive T-cell transfer and chemotherapy in the first-line treatment of metastatic and/or locally recurrent nasopharyngeal carcinoma. Molecular Therapy, 22(1), pp.132-139.

Chinyio, E. A., Olomolaiye, P. O., Kometa, S. T. & Harris, F. C., (1998). A needs-based

methodology for classifying construction clients and selecting contractors. Construction Management & Economics, 16(1), 91–98.

Choi, K., Choe, C., & Lee, D., (2021). The effect of employing temporary workers on

efficiency: Evidence from a meta-frontier analysis. SAGE Open, 11(4), 21582440211058199.

Choi, K., Lee, H.W., Bae, J. & Bilbo, D., (2016). Time-cost performance effect of change

orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3), p.04015085.

Chukwudi, K. C., Osibanjo, A. O., Bolodeoku, P. B., Ogunyemi, I. O., Ipelke, J. F., &

Okpalaoka, C., 2022. The impact of monitoring and evaluation of learning and development outcomes on employee productivity. Academy of Strategic Management Journal, 21, 1-15.

Dainty A. R. J, Ison S. G. & Root D. S., (2004). Bridging the skills gap: a regionally driven

strategy for resolving the construction labour market crisis, Engineering, Construction and Architectural Management, Volume 11, (4), 275–283.

Dai, J., Goodrum, P.M. and Maloney, W.F., (2009). Construction craft workers’ perceptions

of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), 217–226.

Dilawer, S.A., 2014. Control the loss of labor productivity. Int. J. Civ. Struct. Eng. Res., 2(1),

pp.104-110.

Enshassi, A., Mohamed, S., Mustafa, Z. A., & Mayer, P. E., (2007). Factors affecting labour

productivity in building projects in the Gaza Strip. Journal of civil engineering and management, 13(4), 245–254.

Gal, P.N., (2013). Measuring total factor productivity at the firm level using OECD-ORBIS.

George D, & Mallery, P., (2003). SPSS for Windows step by step: A simple guide and

reference. 11.0 update 4th edition Boston: Allyn & Bacon.

Gopal, T.S.R. & Murali, K., (2015). A critical review of factors influencing labour productivity

in construction. IOSR Journal of Mechanical and Civil Engineering, 12(5), 47-51.

Hai, D. T., & Van Tam, N., 2019. Application of the regression model for evaluating factors

affecting construction workers’ labour productivity in Vietnam. The Open Construction & Building Technology Journal, 13(1).

Halwatura, R. U., (2015). Critical factors which govern labour productivity in the building

construction industry in Sri Lanka. PM World Journal, 4(4), pp.1-13.

Herbsman, Z. & Ellis, R., (1990). Research of factors influencing construction

productivity. Construction Management and Economics, 8(1), pp.49-61.

Hernesniemi H., M. Lammi, and P. Ylä-Anttila; P. Rouvinen (ed.), (1996). ‘Advantage

Finland: The Future of Finnish Industries’. Research Institute of the Finnish Economy (ETLA) and Finnish National Fund for Research and Development (SITRA). Helsinki: Taloustieto Oy.

Heshmati, A. and Rashidghalam, M., (2018). Labour productivity in Kenyan manufacturing

and service industries (pp. 259–286). Springer International Publishing.

Hickson, B. G., & Ellis, L. A., (2014). Factors affecting construction labour productivity in

Trinidad and Tobago. The Journal of the Association of Professional Engineers of Trinidad and Tobago, 42(1), 4–11.

Hiyassat, M. A., Hiyari, M. A., & Sweis, G. J., (2016). Factors affecting construction labour

productivity: a case study of Jordan. International Journal of Construction Management, 16(2), 138-149.

Horman, M. J. & Kenley, R., (2005). Quantifying levels of wasted time in construction with

meta-analysis. Journal of construction engineering and management, 131(1), 52-61.

Horner, R. M. W., Talhouni, B. T. & Thomas H. R., (1989). Preliminary Results of Major

Labour Productivity Monitoring Program. Proceedings of the 3rd Yugoslavian Symposium on Construction Management, Cavtat, 18-28.

Hu, X., & Liu, C., (2017). Total factor productivity measurement with carbon

reduction. Engineering, construction and architectural management, 24(4), 575-592.

Jarkas, A.M. & Bitar, C.G., (2012). Factors affecting construction labor productivity in

Kuwait. Journal of Construction Engineering and Management, 138(7), pp.811-820.

Jarkas, A. M., & Haupt, T. C., (2015). Major construction risk factors considered by general

contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 165-194.

Irfan, M., Zahoor, H., Abbas, M. & Ali, Y. (2020). Determinants of labor productivity for

building projects in Pakistan. Journal of Construction Engineering, Management & Innovation, 3(2), 85–100.

İşgören, N.Ç., Çınar, A., Tektaş, N., Oral, B., Büyükpehlivan, G., Ulusman, L., Öznaz, D.,

Polat, Z. & Uzmanoğlu, S., (2009). The importance of cooperation between vocational schools and industry. Procedia-Social and Behavioral Sciences, 1(1), pp.1313-1317.

Kaoma, C. & Muya, M., (2016). Artisan Gaps in the Construction Industry in

Zambia. American Scientific Research Journal for Engineering, Technology, and Sciences (ASRJETS), 18(1), 235-251.

Kirchberger, M., (2020). The Construction Sector in Developing Countries: Some Key

Issues. Mining for Change, pp.51-73.

Kyei, P., & Bamfo-Agyei, E. (2021). Determining Labour Productivity for Masonry Works on

Construction Sites. African Journal of Applied Research, 7(1), 17-26.

Lewis, T.M., 2009. Quantifying the GDP Construction Relationship Economics for Modern

Built Environmental. London: Taylor and Francis, pp.34-59

Lim, V.K., (1996). Job insecurity and its outcomes: Moderating effects of work-based and

nonwork-based social support. Human relations, 49(2), pp.171–194.

Liu, Z., Liu, J., Hu, R., Yang, B., Huang, X. &Yang, L., (2023). Calendar events' influence on

the relationship between metro ridership and the built environment: A heterogeneous effect analysis in Shenzhen, China. Tunnelling and Underground Space Technology, 141, p.105388.

Mahamid, I., (2020). Study of relationship between rework and labor productivity in Building

Construction Projects. Revista de la construcción, 19(1), 30-40.

Makulsawatudom, A., Emsley, M. and Sinthawanarong, K., 2004. Critical factors influencing

construction productivity in Thailand. The journal of KMITNB, 14 (3), pp.1-6.

Makulsawatudom, A. & Emsley, M., (2003), March. Factors affecting the productivity of the

construction industry in Thailand: The foremen's perception. In Construction Research Congress: Wind of Change: Integration and Innovation (pp. 1-10).

Mattoussi, W., & M. Ayadi., (2017). ‘The Dynamics of Exporting and Innovation’. Journal of

African Economies, 26(1): 52–66.

Ministry of Works and Supply, (2006). Government of Republic of Zambia, Draft Policy for

Public-Private Partnerships, Lusaka.

Mirahadi, F. & Zayed, T., (2016). Simulation-based construction productivity forecast using

neural-network-driven fuzzy reasoning. Automation in Construction, 65, pp.102-115.

Moselhi, O. & Khan, Z., (2012). Significance ranking of parameters impacting construction

labour productivity. Construction Innovation, 12(3), pp.272-296.

Muhammad, N. Z., Sani, A., Muhammad, A., Balubaid, S., Ituma, E. E., & Suleiman, J. H.,

(2015). Evaluation of factors affecting labour productivity in construction industry: a case study. Jurnal Teknologi, 77(12), 87-91.

Muhwezi, L., Acai, J. & Otim, G., (2014). An assessment of the factors causing delays on

building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1), 13-23.

Murari, S. S., & Joshi, A. M., (2019). Factors affecting labour productivity in precast

construction industry. In Proceedings of the fourth national conference on road and infrastructure.

Muya, M., Price, A.D.F. and Edum-Fotwe, F.T., (2007). Training levy to support construction

craft skills training in Zambia. West Indian Journal of Engineering, 30(1), 37–44.

Muya, M., Kaliba, C., Sichombo, B. & Shakantu, W., (2013). Cost escalation, schedule

overruns and quality shortfalls on construction projects: The case of Zambia. International Journal of Construction Management, 13(1), pp.53-68.

Mwanaumo, E. M., Thwala, W. D. & Mambwe, M., 2018. Multi Stakeholder Consultative

Framework for Construction Health and Safety: Role of Client and Project Manager. Livingstone, Zambia, DII Conference Series, pp. 235-246.

Nasir, H., Haas, C.T., Rankin, J.H., Fayek, A.R., Forgues, D. & Ruwanpura, J., (2012).

Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957–967.

National Council for Construction, (2004). Development of contractor registration scheme with

a focus on small-scale civil works contractors: final report.

National Council for Construction, (2021). Annual Report. Lusaka.

Neely, A., (1998). Three modes of measurement: theory and practice. International journal of

business performance management, 1(1), 47–64.

Neuman, W. L. (2003). Social Research Methods: Qualitative and Quantitative Approaches,

Relevance of social research, Vol. 8, available at: http://books.google.fr/books?id=nObtAAAAMAAJ.

Ngoma, S., Muya M., and Kaliba, C., 2014. Benefits, Constraints and Risks in Infrastructure

Development via Public-Private Partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp 15-33.

Ngoma, S., Mwanaumo, E. M., & Kaliba, C., (2024). Measuring Productivity in Labour-

Intensive Construction Projects in Zambia. Journal-Innovation, 76 (2), pp 476-485.

Ngomi, A., (2017). Factors affecting project performance among local contractors. The

International Journal of Multi-Disciplinary Research ISSN, 3471–7102.

Nguyen, Q. T., Van Tam, N., Dinh, T. H. & Quy, N. L. D., (2020). Critical factors affecting

labour productivity within construction project implementation: a project manager's perspective. Entrepreneurship and Sustainability Issues, 8(2), 751.

Nyoni, T. & Bonga, W.G., 2016. An empirical investigation of factors affecting construction

sector labour productivity in Zimbabwe. International Journal of Business and Management Invention (IJBMI), 5(8), 68-79.

Ofori G., (2000). The knowledge-based economy and construction industries in developing

countries. Proceedings: CIB W107 1st International conference: Creating a sustainable construction industry in developing countries, 11 to 13 November 2000, Stellenbosch, South Africa.

Ohueri, C.C., Enegbuma, W.I., Wong, N.H., Kuok, K.K. & Kenley, R., (2018). Labour

productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp.293-304.

O’Grady, J. & McCabe, B., (2014). Productivity in the construction industry: concepts, trends,

and measurement issues. University of Toronto.

Olomolaiye, P., Kaming, P., Holt, G., & Harris, F. (1996). "Factors influencing craftsmen’s

productivity in Indonesia", Int. J. Proj. Manag., 15, (1), 21-30.

Oo, B. L. & Lim, B.T.H. (2023). Women Workforces’ Satisfaction with Personal Protective

Equipment: A Case of the Australian Construction Industry. Buildings, 13(4), 959.

Palikhe, S., Kim, S. & Kim, J. J., (2019). Critical success factors and dynamic modeling of

construction labour productivity. International Journal of Civil Engineering, 17(3), 427-442.

Polta, G., & Arditi, P. (2005). The JIT Management System in developing countries”

Construction Management and Economics, 23(7), 697-712.

Poole, M. A., & O'Farrell, P. N., (1971). The assumptions of the linear regression

model. Transactions of the Institute of British Geographers, 145–158.

Porter, M., (1990). The Competitive Advantage of Nations. New York: The Free Press.

Rose, N., (1996). The death of the social? Re-figuring the territory of government. International

Journal of Human Resource Management, 25(3), 327–356.

Sampa, C., (2016). An evaluation of Worker's welfare facilities and its effects on productivity

in the Zambian Construction Industry (Masters dissertation, University of Zambia).

Sylvia, C., (2017). An Investigation into the factors affecting project performance among

contractors in Lusaka District of Zambia.

Thwala, W. D., (2007). Challenges facing labour-intensive public works programmes and

projects in South Africa. International Journal of Construction Management, 7(2), 1-9.

Van Thanh, L., (2016). Relationship at work as a cause of occupational stress: the case of

academic women in Vietnam. International journal of mental health systems, 10, pp.1-15.

Vogl, B., & Abdel-Wahab, M., (2015). Measuring the construction industry’s productivity

performance: Critique of international productivity comparisons at industry level. Journal of construction engineering and management, 141(4), 04014085.

Wu, J., Du, H., Li, X. &Li, P., (2010). Creating and Delivering a Successful Knowledge

Management Strategy, in Russ, M. (Ed.), Knowledge Management Strategies for Business Development, Business Science Reference, Hershey, pp. 261–272.

Yi, W. & Chan, A.P., (2014). A critical review of labour productivity research in construction

journals. Journal of Management in Engineering, 30(2), 214–225.

Zhao, T. & Dungan, J. M., (2014). Improved baseline method to calculate lost construction

productivity. Journal of Construction Engineering and Management, 140(2), p.06013006.

Zhou, W. & He, J.M., (2013). Generalized GM (1, 1) model and its application in forecasting

of fuel production. Applied Mathematical Modelling, 37(9), pp.6234-6243.